ICI - Final Project - The Project Brief
Posted by Yung on 7:16 AM with No comments
ICI - Final Project - The Project Brief
In a group of 2, we are to choose a site with a size of 30mx30m within the Taylor's Lakeside Campus for our study and come out with an recreation proposal report. The construction project we chosen was to recreate a food and beverage(dining area). The site is located at Block E, level 2, the balcony.
My reflection towards this project is there are a lot of thing out there that we need to learn. To produce a proposal is not that simple, we need to think about the interaction with people around it, the site location, benefit, need to be rationale and must be environmental friendly.
TGC applied throughout this project :
In a group of 2, we are to choose a site with a size of 30mx30m within the Taylor's Lakeside Campus for our study and come out with an recreation proposal report. The construction project we chosen was to recreate a food and beverage(dining area). The site is located at Block E, level 2, the balcony.
My group's Project Brief.
Lee Kai Yung and Chester Sim Si Kai
My reflection towards this project is there are a lot of thing out there that we need to learn. To produce a proposal is not that simple, we need to think about the interaction with people around it, the site location, benefit, need to be rationale and must be environmental friendly.
TGC applied throughout this project :
Categories: FNBE Sem 1, ICI

0 comments:
Post a Comment